Sector
C17.21 corrugated board and packaging.
INDICATIVE NACE CODEProcess
paper rolls → corrugating → gluing → cutting → printing → palletising.
Problem
setup and format change waste is reported in aggregate and not linked to the order and the cause.
What the solution includes
waste container scales; jam cameras; line data; roll–order–format–change link; MES and ERP material report.
What changes
less paper lost in setup and change.
How the result is measured
- What we measure
- kg paper waste / 1,000 m² good corrugated
- Baseline
- weight and production records
- Target
- AFTER DIAGNOSTICafter format analysis
- Evidence
- scales, roll, production order.
Business effect
lower paper cost and clear allocation of losses.
Component parts
ДМА — production section, cameras, scales
ДНА — material model and integrations.
Indicative investment
The concrete value is set per client after technical design and current quotations.
Who does what
EvroPixel builds the material report by roll and order.
corrugated technologist and OT integrator.
What to keep in mind
material yield is the lead result, not overall productivity; scale accuracy and location.
Link to a funding programme
Scope and clarifications
The intended result is verified with data from your process rather than assumed in advance. For a funded project, your SME is the beneficiary. PixelAutomate is the brand under which we work. The contracting company is identified in the quotation, contract, and invoice.