PixelAutomate
Green 2.003

Less new sheet metal for the same accepted parts

Usable remnants often miss the next order because the stock is not identifiable. Connect available material to cutting plans so suitable remnants are considered before new sheet is purchased.

← Back to solutions
Catalogue proposal — not confirmed eligibility

No saving percentage is promised in advance. Technical scope, partners and funding are checked for your specific case.

Who this is for

Manufacturers using laser, plasma or stamping processes with recurring materials.

Activity and prerequisites

KID-2025 screening references: 25. These are not final classifications or eligibility confirmations.

Check business size, revenue, location, sector exclusions, aid regime and an existing product or service where the model requires it. Missing data remains a question, not a positive assessment.

What changes

Measure, identify and physically store remnants; include them in cutting jobs by size, thickness and quality.

Measured flowProcess changeVerified result

How the result is verified

Primary measurement

kg new sheet metal / kg accepted parts; separately record kg remnants actually reused.

Compare orders with similar geometry, material and thickness. Weights, cutting files and part acceptance establish the balance.

Baseline, target and acceptance

Measure the baseline at your operation. An initial planning approach is around four representative operating weeks, extended or separated for seasonality and product mix. This is a planning method, not a programme requirement.

Agree the target after a trial or engineering assessment. Compare equivalent conditions without compromising quality, safety or hygiene. Retain absolute quantities so a normalized indicator cannot conceal losses.

Who delivers what

PixelAutomate

Remnant register connecting stock, cutting and production orders.

Process and equipment

Cutting technologist, equipment supplier and metrology specialist.

These are required roles, not contracted suppliers. Responsibilities, data access, timing and acceptance are confirmed before commitment.

When not to proceed

A register without storage and actual reuse does not demonstrate this model. Sold scrap is not counted as reused material.

Programme sources and related solutions

Referenced conditions and official clarifications:

Offer revision: 2026-09-07. Links lead to the official document page; a cited clarification is not approval of this proposal. Check for newer publications before application advice.

NEXT STEP

Start with the process you want to improve.

We will clarify the problem, the measurement, and the next viable step.

Book a Business Audit