No saving percentage is promised in advance. Technical scope, partners and funding are checked for your specific case.
Who this is for
Fibre, nonwoven, filling or other manufacturers with a validated secondary-textile application.
Activity and prerequisites
KID-2025 screening references: 13. These are not final classifications or eligibility confirmations.
Check business size, revenue, location, sector exclusions, aid regime and an existing product or service where the model requires it. Missing data remains a question, not a positive assessment.
What changes
Separate by composition, remove contaminants, mechanically prepare and incorporate under controlled conditions.
How the result is verified
kg recovered fibre incorporated in accepted product / 100 kg accepted textile input.
Input composition, weight balance, laboratory results and production batches establish the result.
Baseline, target and acceptance
Measure the baseline at your operation. An initial planning approach is around four representative operating weeks, extended or separated for seasonality and product mix. This is a planning method, not a programme requirement.
Agree the target after a trial or engineering assessment. Compare equivalent conditions without compromising quality, safety or hygiene. Retain absolute quantities so a normalized indicator cannot conceal losses.
Who delivers what
PixelAutomate
Composition and batch traceability from receipt to the new product.
Process and equipment
Textile technologist, laboratory, line supplier and waste-regime specialist.
These are required roles, not contracted suppliers. Responsibilities, data access, timing and acceptance are confirmed before commitment.
When not to proceed
Selling a recovered fraction without demonstrated subsequent incorporation by the applicant is not presented as this circular model. Blends and coatings require trials.
Programme sources and related solutions
Referenced conditions and official clarifications:
Offer revision: 2026-09-07. Links lead to the official document page; a cited clarification is not approval of this proposal. Check for newer publications before application advice.