PixelAutomate
Green 2.003

Fewer water losses in an operating hotel

The main meter shows the bill, not the cause. Separate consumption by zone to find leaks and verify the effect of repairs.

← Back to solutions
New proposal for case-specific validation

No saving percentage is promised in advance. Technical scope, partners and funding are checked for your specific case.

Who this is for

Hotels with an existing service, measurable occupancy and sufficient scale for a justified investment.

Activity and prerequisites

KID-2025 screening references: 55. These are not final classifications or eligibility confirmations.

Check business size, revenue, location, sector exclusions, aid regime and an existing product or service where the model requires it. Missing data remains a question, not a positive assessment.

What changes

Zone metering, leak repair and water-supply control. Laundry remains G10, without double counting.

Measured flowProcess changeVerified result

How the result is verified

Primary measurement

l fresh water / occupied room-night; common areas and pools are accounted for separately.

Meter readings, occupancy, seasonality and repair records while maintaining hygiene and service quality.

Baseline, target and acceptance

Measure the baseline at your operation. An initial planning approach is around four representative operating weeks, extended or separated for seasonality and product mix. This is a planning method, not a programme requirement.

Agree the target after a trial or engineering assessment. Compare equivalent conditions without compromising quality, safety or hygiene. Retain absolute quantities so a normalized indicator cannot conceal losses.

Who delivers what

PixelAutomate

Connect metering with occupancy, alerts and response tracking.

Process and equipment

Water-services engineer and metering/control supplier.

These are required roles, not contracted suppliers. Responsibilities, data access, timing and acceptance are confirmed before commitment.

When not to proceed

A new spa service cannot use a hypothetical external baseline. Check rural location and microenterprise status; energy effects alone are insufficient.

Programme sources and related solutions

Referenced conditions and official clarifications:

Offer revision: 2026-09-07. Links lead to the official document page; a cited clarification is not approval of this proposal. Check for newer publications before application advice.

Related solutions cover part of the required scope. Additional technology remains to be validated.

NEXT STEP

Start with the process you want to improve.

We will clarify the problem, the measurement, and the next viable step.

Book a Business Audit