PixelAutomate
Green 2.003

Less spoilage of perishable stock

Stock approaching expiry must reach an appropriate order in time. Combine batch rotation with storage control to reduce physical losses.

← Back to solutions
New proposal for case-specific validation

No saving percentage is promised in advance. Technical scope, partners and funding are checked for your specific case.

Who this is for

Perishable-goods traders with traceable batches and control over storage.

Activity and prerequisites

KID-2025 screening references: 46, 47. These are not final classifications or eligibility confirmations.

Check business size, revenue, location, sector exclusions, aid regime and an existing product or service where the model requires it. Missing data remains a question, not a positive assessment.

What changes

Prioritize expiry dates, monitor conditions and route usable stock in time.

Measured flowProcess changeVerified result

How the result is verified

Primary measurement

kg rejected stock / 1,000 kg comparable sold stock, by rejection cause.

Stock movements, weighed rejects, temperature records and sales; donations and transfers remain separate and cannot conceal losses.

Baseline, target and acceptance

Measure the baseline at your operation. An initial planning approach is around four representative operating weeks, extended or separated for seasonality and product mix. This is a planning method, not a programme requirement.

Agree the target after a trial or engineering assessment. Compare equivalent conditions without compromising quality, safety or hygiene. Retain absolute quantities so a normalized indicator cannot conceal losses.

Who delivers what

PixelAutomate

Batch-priority rules, stock-system integration and action tracking after alerts.

Process and equipment

Cold-chain and relevant product-safety specialist.

These are required roles, not contracted suppliers. Responsibilities, data access, timing and acceptance are confirmed before commitment.

When not to proceed

Lower electricity bills or more sales do not replace evidence of reduced waste. Programme review concerns the existing trading service.

Programme sources and related solutions

Referenced conditions and official clarifications:

Offer revision: 2026-09-07. Links lead to the official document page; a cited clarification is not approval of this proposal. Check for newer publications before application advice.

Related solutions cover part of the required scope. Additional technology remains to be validated.

NEXT STEP

Start with the process you want to improve.

We will clarify the problem, the measurement, and the next viable step.

Book a Business Audit