No saving percentage is promised in advance. Technical scope, partners and funding are checked for your specific case.
Who this is for
Ceramic manufacturers with their own glazing process and a separable material stream.
Activity and prerequisites
KID-2025 screening references: 23.3, 23.4. These are not final classifications or eligibility confirmations.
Check business size, revenue, location, sector exclusions, aid regime and an existing product or service where the model requires it. Missing data remains a question, not a positive assessment.
What changes
Collect, remove impurities, filter and return suitable suspension under controlled conditions.
How the result is verified
kg fresh glaze material / m² accepted coating; additionally the proportion actually reincorporated.
Reconcile material balance and dosing records with laboratory results and post-firing quality.
Baseline, target and acceptance
Measure the baseline at your operation. An initial planning approach is around four representative operating weeks, extended or separated for seasonality and product mix. This is a planning method, not a programme requirement.
Agree the target after a trial or engineering assessment. Compare equivalent conditions without compromising quality, safety or hygiene. Retain absolute quantities so a normalized indicator cannot conceal losses.
Who delivers what
PixelAutomate
Batch release, recipe restrictions and material-balance tracking.
Process and equipment
Ceramic technologist, laboratory and filtration/dosing supplier.
These are required roles, not contracted suppliers. Responsibilities, data access, timing and acceptance are confirmed before commitment.
When not to proceed
Contaminated or incompatible suspension is not returned. An energy-efficient kiln alone does not establish a material model.
Programme sources and related solutions
Referenced conditions and official clarifications:
Offer revision: 2026-09-07. Links lead to the official document page; a cited clarification is not approval of this proposal. Check for newer publications before application advice.
Related solutions cover part of the required scope. Additional technology remains to be validated.