PixelAutomate
Green 2.003

Less product lost during filling

Overfill in each package and line losses increase input consumption. Dose control must reduce these deviations without underfilling.

← Back to solutions
New proposal for case-specific validation

No saving percentage is promised in advance. Technical scope, partners and funding are checked for your specific case.

Who this is for

Cosmetics or detergent manufacturers with recurring nominal quantities.

Activity and prerequisites

KID-2025 screening references: 20.4. These are not final classifications or eligibility confirmations.

Check business size, revenue, location, sector exclusions, aid regime and an existing product or service where the model requires it. Missing data remains a question, not a positive assessment.

What changes

Checkweigh, correct dosing and return product only where technically permitted and quality allows.

Measured flowProcess changeVerified result

How the result is verified

Primary measurement

kg product input / 1,000 accepted packages with the same nominal content.

Batch weighing, control samples and quality records; packaging material is not mixed with content weight.

Baseline, target and acceptance

Measure the baseline at your operation. An initial planning approach is around four representative operating weeks, extended or separated for seasonality and product mix. This is a planning method, not a programme requirement.

Agree the target after a trial or engineering assessment. Compare equivalent conditions without compromising quality, safety or hygiene. Retain absolute quantities so a normalized indicator cannot conceal losses.

Who delivers what

PixelAutomate

Connect batch, filling line and dose control.

Process and equipment

Technologist and dosing/checkweighing supplier.

These are required roles, not contracted suppliers. Responsibilities, data access, timing and acceptance are confirmed before commitment.

When not to proceed

Underfilling or unvalidated product return are not acceptable savings methods. Exact activity and exclusions require separate checks.

Programme sources and related solutions

Referenced conditions and official clarifications:

Offer revision: 2026-09-07. Links lead to the official document page; a cited clarification is not approval of this proposal. Check for newer publications before application advice.

NEXT STEP

Start with the process you want to improve.

We will clarify the problem, the measurement, and the next viable step.

Book a Business Audit