PixelAutomate
Green 2.003

Return material from fresh residual concrete to production

Unhardened residual concrete can yield usable material and water for a new batch. Demonstrate this through recipe testing and material balance, not merely an operating recovery machine.

← Back to solutions
New proposal for case-specific validation

No saving percentage is promised in advance. Technical scope, partners and funding are checked for your specific case.

Who this is for

Concrete and concrete-product manufacturers with a measurable own residual stream.

Activity and prerequisites

KID-2025 screening references: 23.6. These are not final classifications or eligibility confirmations.

Check business size, revenue, location, sector exclusions, aid regime and an existing product or service where the model requires it. Missing data remains a question, not a positive assessment.

What changes

Recover suitable aggregate and process water and incorporate them into own production under controlled conditions.

Measured flowProcess changeVerified result

How the result is verified

Primary measurement

kg recovered material incorporated in accepted output / kg eligible residual stream × 100; separate water balance.

Input/output weights, batch recipes and strength/conformity tests.

Baseline, target and acceptance

Measure the baseline at your operation. An initial planning approach is around four representative operating weeks, extended or separated for seasonality and product mix. This is a planning method, not a programme requirement.

Agree the target after a trial or engineering assessment. Compare equivalent conditions without compromising quality, safety or hygiene. Retain absolute quantities so a normalized indicator cannot conceal losses.

Who delivers what

PixelAutomate

Stream traceability connected to recipes and quality control.

Process and equipment

Concrete technologist, laboratory and recovery-installation supplier.

These are required roles, not contracted suppliers. Responsibilities, data access, timing and acceptance are confirmed before commitment.

When not to proceed

Receiving third-party construction waste under an excluded activity is not equivalent to this model. Q&A 27 concerns the lifecycle stage, not automatic approval of every recovery-machine project.

Programme sources and related solutions

Referenced conditions and official clarifications:

Offer revision: 2026-09-07. Links lead to the official document page; a cited clarification is not approval of this proposal. Check for newer publications before application advice.

Related solutions cover part of the required scope. Additional technology remains to be validated.

NEXT STEP

Start with the process you want to improve.

We will clarify the problem, the measurement, and the next viable step.

Book a Business Audit