No saving percentage is promised in advance. Technical scope, partners and funding are checked for your specific case.
Who this is for
Construction businesses using owned modular formwork for actual services.
Activity and prerequisites
KID-2025 screening references: 41, 42, 43. These are not final classifications or eligibility confirmations.
Check business size, revenue, location, sector exclusions, aid regime and an existing product or service where the model requires it. Missing data remains a question, not a positive assessment.
What changes
Identify, inspect, repair or replace against defined criteria and plan reuse between sites.
How the result is verified
kg new formwork material / m² comparable completed formwork area; additionally safe use cycles per element.
Inventory, inspection/repair records and delivered-service records. Cycle counts cannot replace technical condition assessment.
Baseline, target and acceptance
Measure the baseline at your operation. An initial planning approach is around four representative operating weeks, extended or separated for seasonality and product mix. This is a planning method, not a programme requirement.
Agree the target after a trial or engineering assessment. Compare equivalent conditions without compromising quality, safety or hygiene. Retain absolute quantities so a normalized indicator cannot conceal losses.
Who delivers what
PixelAutomate
Element history, availability planning and inspection evidence.
Process and equipment
Formwork supplier and competent construction engineer.
These are required roles, not contracted suppliers. Responsibilities, data access, timing and acceptance are confirmed before commitment.
When not to proceed
Ordinary replacement without a circular model is insufficient. Check investment location, regional category and durability; Q&A 52 allows activity-dependent use at customers' sites but does not remove these conditions.
Programme sources and related solutions
Referenced conditions and official clarifications:
Offer revision: 2026-09-07. Links lead to the official document page; a cited clarification is not approval of this proposal. Check for newer publications before application advice.
Related solutions cover part of the required scope. Additional technology remains to be validated.