Sector
C13.3 textile finishing.
INDICATIVE NACE CODEProcess
preparation → dyeing or washing → rinsing → finishing → colour control → wastewater.
Problem
water and chemicals are not allocated by batch and recipe; rinsing runs by time rather than measured state.
What the solution includes
water meters; dosing flow meters; conductivity and colour sensors; read-only machine data; phase model; laboratory colour results; ERP report.
What changes
less fresh water and chemicals per kg good textile.
How the result is measured
- What we measure
- m³ fresh water / t good textile
- Baseline
- per-machine and per-batch measurement
- Target
- AFTER DIAGNOSTICafter technology validation
- Evidence
- water meters, recipe, laboratory protocol.
Business effect
lower water and chemical cost and fewer re-dyeing cycles.
Component parts
ДМА — dyeing/washing equipment, dosing, water recycle, measurement
ДНА — phase and recipe model.
Indicative investment
The concrete value is set per client after technical design and current quotations.
Who does what
EvroPixel builds the water and recipe model.
textile chemist, water technologist, OT integrator.
What to keep in mind
wastewater permits and limits; energy is not the lead green result; automatic changes only after validation.
Link to a funding programme
Scope and clarifications
The intended result is verified with data from your process rather than assumed in advance. For a funded project, your SME is the beneficiary. PixelAutomate is the brand under which we work. The contracting company is identified in the quotation, contract, and invoice.